System Analysis and Design
Which of the following is not a factor in the failure of a systems development project ?

failure of systems integration
None of these
inadequate user involvement
size of company
continuation of a project that should have been cancelled

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Cost-Benefit analysis

compares the cost, with the benefits, of introducing a computer-based system
None of these
evaluates the tangible and non-tangible factors
estimates the hardware and software costs
All of these