Power Systems Which of the following is low specific speed turbine? Kaplan None of these Pelton Francis Kaplan None of these Pelton Francis ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 740 MW. 710 MW. 730 MW. 720 MW. 740 MW. 710 MW. 730 MW. 720 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generator has reactances of sub transient (X")= 0.5 pu, transient (X') = 0.8 pu and synchronous reactance (X) = 5 pu. The voltages at these reactances are 1.2 V, 1.1 V and 1 V respectively. Find the corresponding sub transient fault current in pu? 1.375 pu 0.2 pu 3.975 pu 2.4 pu 1.375 pu 0.2 pu 3.975 pu 2.4 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems In boiler water reactor (BWR) the feed water acts both coolant and a moderator. enriched uranium is used as fuel. there is danger of radioactive contamination of steam. all of above. the feed water acts both coolant and a moderator. enriched uranium is used as fuel. there is danger of radioactive contamination of steam. all of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Oxide film arrestor has which of the following properties? Does not require daily charging. Both A and B. Installed at points of transmission line where daily visit is difficult. It is expensive. Does not require daily charging. Both A and B. Installed at points of transmission line where daily visit is difficult. It is expensive. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive sequence reactance will be equal to negative sequence if the equipment is motor. generator. transformer and transmission lines. none of these. motor. generator. transformer and transmission lines. none of these. ANSWER DOWNLOAD EXAMIANS APP