Irrigation Engineering Which of the following is a non-recording raingauge ? Steven’s weighing type raingauge tipping bucket type raingauge floating type raingauge Simon’s raingauge Steven’s weighing type raingauge tipping bucket type raingauge floating type raingauge Simon’s raingauge ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For cereal crops the most commonly adopted method of irrigation, is Sprinkling method Free flowing method Check method Furrow method Sprinkling method Free flowing method Check method Furrow method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which one of the following statements is correct? The canal system runs on ridges, gets divided into smaller channels and spreads its water on the land All listed here The canal system and the drainage system are complementary The drainage system runs along the lowest line, collects drainage water from the slopes and joins the main stream The canal system runs on ridges, gets divided into smaller channels and spreads its water on the land All listed here The canal system and the drainage system are complementary The drainage system runs along the lowest line, collects drainage water from the slopes and joins the main stream ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hydraulic jump is generally formed when a stream moving with A hyper-critical velocity meets a stream moving with a sub-critical velocity A sub-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a critical velocity A hyper-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a sub-critical velocity A sub-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a critical velocity A hyper-critical velocity meets a stream moving with a hyper-critical velocity ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering As compared to crest of the normal portion of the weir, the crest of the under sluice portion of weir is kept at higher level any of the above depending on the design lower level same level higher level any of the above depending on the design lower level same level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The crest level of a canal diversion head work, depends upon All listed here Pond level Discharge perimeters F.S.L. of the canal All listed here Pond level Discharge perimeters F.S.L. of the canal ANSWER DOWNLOAD EXAMIANS APP