Automation System When one must sell a project to management, the most important document he or she can produce is a: method for financing the project summary of the problem None of these project evaluation procedure for purchase method for financing the project summary of the problem None of these project evaluation procedure for purchase ANSWER DOWNLOAD EXAMIANS APP
Automation System CAE and CAM are linked through: parts production and testing assembly automation and tool production. a common data base and communications system None of these NC tape programming and automated design parts production and testing assembly automation and tool production. a common data base and communications system None of these NC tape programming and automated design ANSWER DOWNLOAD EXAMIANS APP
Automation System If a sine wave has a frequency of 500 Hz, the period in seconds of the sine wave is: 5000 0.003 0.002. None of these 0.02 5000 0.003 0.002. None of these 0.02 ANSWER DOWNLOAD EXAMIANS APP
Automation System If the period of a sine wave is 0.001 second, the frequency of the sine wave is: 10 Hz None of these 1,000 Hz 10,000 Hz 0.001 Hz 10 Hz None of these 1,000 Hz 10,000 Hz 0.001 Hz ANSWER DOWNLOAD EXAMIANS APP
Automation System The general type of process found in industry is: discrete parts continuous All of these None of these batch discrete parts continuous All of these None of these batch ANSWER DOWNLOAD EXAMIANS APP
Automation System Flexible manufacturing allows for: None of these tool design and tool production quick and inexpensive product changes automated design factory management None of these tool design and tool production quick and inexpensive product changes automated design factory management ANSWER DOWNLOAD EXAMIANS APP