Irrigation Engineering When a canal flowing under pressure is carried below a natural drainage such that its F.S.L. doesnot touch the underside of the supporting structure, the structure so provided, is called Syphon Syphon-aqueduct Aqueduct Super passage Syphon Syphon-aqueduct Aqueduct Super passage ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering An outlet which maintains a constant discharge irrespective of fluctuation in the water levels of the supplying channel or water course, is known as Semi-modular outlet Flexible modular outlet Non-modular outlet Right modular outlet Semi-modular outlet Flexible modular outlet Non-modular outlet Right modular outlet ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 25 m3/sec 20 m3/sec 30 m3/sec 35 m3/sec 25 m3/sec 20 m3/sec 30 m3/sec 35 m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Trough stage of the river Rock stage of the river Delta stage of the river Boulders stage of the river Trough stage of the river Rock stage of the river Delta stage of the river Boulders stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In North Indian Plains, optimum depth of kor watering for wheat, is 23.0 cm 19.0 cm 13.5 cm 17.5 cm 23.0 cm 19.0 cm 13.5 cm 17.5 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a cross regulator is provided on the canal below the crossing ANSWER DOWNLOAD EXAMIANS APP