Waste Water Engineering Dry water flow in a combined sewer, is Industrial sewage Storm water Domestic sewage Inclusive of domestic and industrial sewage but excludes storm water Industrial sewage Storm water Domestic sewage Inclusive of domestic and industrial sewage but excludes storm water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to Weight of the back fill Superimposed traffic loads Weight of the pipe All listed here Weight of the back fill Superimposed traffic loads Weight of the pipe All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of design discharge to the surface area of a sedimentation tank is called All of these Surface loading Overflow rate Overflow velocity All of these Surface loading Overflow rate Overflow velocity ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 4 m 3 m 4.5 m 3.5 m 4 m 3 m 4.5 m 3.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Hardness Suspended solids Sediments Bacterias Hardness Suspended solids Sediments Bacterias ANSWER DOWNLOAD EXAMIANS APP