Engineering Drawing Understanding the Cartesian coordinate system will help the beginning drafter __________. Produce a visible grid system Control the accuracy of the drawing Choose various line types Select a different text style Produce a visible grid system Control the accuracy of the drawing Choose various line types Select a different text style ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing These weld symbols have no arrow-side or other-side significance: Projection or seam weld Flash and upset weld Back or backing weld Surface or groove weld Projection or seam weld Flash and upset weld Back or backing weld Surface or groove weld ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Using the Relative Polar Coordinate System to add a 3 inch line that is 45 degrees from the end point of the line created above the drafter would ________. Type @3 Type 3 forward slash and enter Type 3 and try to use the Dynamic Input readout to find the end point Type 3 back slash and enter Type @3 Type 3 forward slash and enter Type 3 and try to use the Dynamic Input readout to find the end point Type 3 back slash and enter ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Auto-CAD refers to isometric ellipses as ________. Circles Iso-ellipses Ellipses Iso-circles Circles Iso-ellipses Ellipses Iso-circles ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The offset distance for the width (front to back) distance of the auxiliary view is the same distance of the ________ in the top view. Width Length Height None of these Width Length Height None of these ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Once a drawing is determined to be complete, the title block is used to document the change from: An assembly to a finished drawing A working drawing to a draft A draft to a finished drawing A finished to a working drawing An assembly to a finished drawing A working drawing to a draft A draft to a finished drawing A finished to a working drawing ANSWER DOWNLOAD EXAMIANS APP