GETCO Exam Paper (22-07-2015) Two watt meter method for 3 phase circuit is preferred over other methods because PF of the load can also be estimated it can be used for balanced or unbalanced load all are correct it can be used for star or delta connected load PF of the load can also be estimated it can be used for balanced or unbalanced load all are correct it can be used for star or delta connected load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In which of the following festivals are boat races a special feature? Onam Rongali Bihu Pongal Navaratri Onam Rongali Bihu Pongal Navaratri ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For selecting low voltage cable which of the following factors is not important? permissible voltage drop voltage grade short circuit current rating current carrying capacity permissible voltage drop voltage grade short circuit current rating current carrying capacity ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be 1 + j2 3 + j6 9 + j10 3 - j6 1 + j2 3 + j6 9 + j10 3 - j6 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Spinning reserve Minimum down time Minimum up time all are correct Spinning reserve Minimum down time Minimum up time all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In differential protection scheme, a stabilizing resistance connected to increase the current limit increase the relay sensitivity reduce the effect of non identical CTs block harmonics increase the current limit increase the relay sensitivity reduce the effect of non identical CTs block harmonics ANSWER DOWNLOAD EXAMIANS APP