Engineering Drawing This is used in applications for nonferrous construction: Copper tubing PVC pipe Steel pipe Iron tubing Copper tubing PVC pipe Steel pipe Iron tubing ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing A secondary auxiliary view is a projection off of the __________. Primary auxiliary view None of these Top view Front view Primary auxiliary view None of these Top view Front view ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing This is the measured size of a finished part: Production size Basic size Actual size Dimensioned size Production size Basic size Actual size Dimensioned size ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When using the direct entry method to create a horizontal line exactly three inches long the drafter should ________ first. Enter 3 for the length of the line Pull the line from away from the starting point very carefully Read the coordinate position on the Dynamic Readout Insure that Ortho is on Enter 3 for the length of the line Pull the line from away from the starting point very carefully Read the coordinate position on the Dynamic Readout Insure that Ortho is on ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it. Explode None of these Copy Offset Explode None of these Copy Offset ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing An accurate record of changes made to release drawings is tracked via this: The basic title form A revision block Portable documents Working drawings The basic title form A revision block Portable documents Working drawings ANSWER DOWNLOAD EXAMIANS APP