Irrigation Engineering The water stored in the reservoir below the minimum pool level is called dead storage valley storage surcharge storage useful storage dead storage valley storage surcharge storage useful storage ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The unit hydrograph due to a storm may be obtained by dividing the ordinates of the direct runoff hydrograph by period of storm total rainfall direct runoff volume None of these period of storm total rainfall direct runoff volume None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls Of height ⅓rd to ¼th the depth of water in the main canal Of R.C.C. or steel plate 8 cm thick Spaced at interval of 1½ times their heights All listed here Of height ⅓rd to ¼th the depth of water in the main canal Of R.C.C. or steel plate 8 cm thick Spaced at interval of 1½ times their heights All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A river bend characterized by silting silting on convex side scouring on concave side and silting on convex side scouring on convex side and on concave side scouring on concave side silting on convex side scouring on concave side and silting on convex side scouring on convex side and on concave side scouring on concave side ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering As compared to gravity dams, earthen dams require sound rock foundations are less susceptible to failure require less skilled labour are costlier require sound rock foundations are less susceptible to failure require less skilled labour are costlier ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream ANSWER DOWNLOAD EXAMIANS APP