The time constant of a unity gain, first order plus time delay process is 5 min. If the phase lag at a frequency of 0.2 rad/min is 60°, then the dead time (in minutes) is

π/6
5π/12
π/3
π/12

ANSWER DOWNLOAD EXAMIANS APP

Process Control and Instrumentation
Which of the following is not a speed measuring instrument?

All of these
Psychrometer
Stroboscope
Tachometer

ANSWER DOWNLOAD EXAMIANS APP

Process Control and Instrumentation
Liquid flow rate in an open channel can not be measured by a/an

Orifice meter
V-notch
Cipolletti weir
Rectangular weir

ANSWER DOWNLOAD EXAMIANS APP

Process Control and Instrumentation
In a feed-back control system G and H denote open loop and close loop transfer functions respectively. The output-input relationship is

H/G
G/H
H(1 + G)
G/(1 + H)

ANSWER DOWNLOAD EXAMIANS APP

Process Control and Instrumentation
The transfer function of a first order system is

1/Ts
1/(Ts + 1)
None of these
S/(Ts + 1)

ANSWER DOWNLOAD EXAMIANS APP

Process Control and Instrumentation
__________ is the static characteristics of an instrument,

Response
Tine lag
Drift
Dynamic error

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Process Control and Instrumentation

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑