Waste Water Engineering The spacing of bars for perforations in coarse screens used for the treatment of sewage, is 40 mm 30 mm 20 mm 50 mm 40 mm 30 mm 20 mm 50 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for The flow of sewage to fill the tank A particle to travel along its length None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank A particle to travel along its length None of these A particle to travel from top surface to bottom sludge zone ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to Superimposed traffic loads Weight of the pipe All listed here Weight of the back fill Superimposed traffic loads Weight of the pipe All listed here Weight of the back fill ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dry water flow in a combined sewer, is Domestic sewage Storm water Industrial sewage Inclusive of domestic and industrial sewage but excludes storm water Domestic sewage Storm water Industrial sewage Inclusive of domestic and industrial sewage but excludes storm water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of design discharge to the surface area of a sedimentation tank is called Overflow velocity All of these Overflow rate Surface loading Overflow velocity All of these Overflow rate Surface loading ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 4.5 m 4 m 3.5 m 3 m 4.5 m 4 m 3.5 m 3 m ANSWER DOWNLOAD EXAMIANS APP