Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known House sewer Sewer outfall Branch sewer Lateral sewer House sewer Sewer outfall Branch sewer Lateral sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of maximum sewage flow to average sewage flow for mains up to 1 m in diameter, is 4 2 1.5 3 4 2 1.5 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage is generally Alkaline Highly decomposed A source of objectionable odour Acidic Alkaline Highly decomposed A source of objectionable odour Acidic ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed 2.5 1.5 2 3 2.5 1.5 2 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, Detention period is 2 hours The shape is rectangular All of these The velocity of flow is restricted to 0.30 m/minute Detention period is 2 hours The shape is rectangular All of these The velocity of flow is restricted to 0.30 m/minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 7 days 12 days 14 days 2 days 7 days 12 days 14 days ANSWER DOWNLOAD EXAMIANS APP