DGVCL Exam Paper (12-06-2016) The relay operating speed depends upon The rate of flux built up All of these The spring tension Armature core air gap The rate of flux built up All of these The spring tension Armature core air gap ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The Electricity Act is an Act of _____of India enacted to transform the power sector in India. A State resolution The Parliament All of these None of these A State resolution The Parliament All of these None of these ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) If 3000 kW power is to be transmitted over a distance of 30 km, the desirable transmission voltage will be 11 kV 33 kV 66 kV 132 kV 11 kV 33 kV 66 kV 132 kV ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) Core type transformers are popular in _____ Low voltage applications All of these High voltage applications None of these Low voltage applications All of these High voltage applications None of these ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) Transformer core is laminated to _____ Reduce hysteresis loss Reduce eddy current losses Reduce all above losses Reduce copper losses Reduce hysteresis loss Reduce eddy current losses Reduce all above losses Reduce copper losses ANSWER EXPLANATION DOWNLOAD EXAMIANS APP To reduce eddy current loss laminations is done.To reduce hysteresis loss good magnetic material (whose specific hysterisis loss is low) is used.
DGVCL Exam Paper (12-06-2016) The process of a computer receiving information from a server via Internet is known as: Downloading Retrieving Uploading All of these Downloading Retrieving Uploading All of these ANSWER DOWNLOAD EXAMIANS APP