Irrigation Engineering
The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to

Both load and plant factor
Load factor
Plant factor
Utilization factor

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
A counter berm is

A horizontal benching provided on the inside slope
A horizontal benching provided on the outside slope
A vertical benching provided on the outer edge of the bank
A vertical benching provided on the inner edge of the bank

ANSWER DOWNLOAD EXAMIANS APP