GETCO Exam Paper (30-11-2008) The Non-co-operation movement was launched by Mahatma Gandhi in 1920 1926 1905 1921 1920 1926 1905 1921 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) An AC transmission line requires a VAR input: to reduce losses to improve stability to improve the regulation to increase power transmission to reduce losses to improve stability to improve the regulation to increase power transmission ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In an over current protection, the setting of earth fault relay is _____ the phase fault relay. not related in less than equal to more than not related in less than equal to more than ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In the protection scheme relay functions as _____ device breaking switching none of these sensing breaking switching none of these sensing ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The planning Commission was set up in January, 1948 September, 1947 April, 1947 March,1950 January, 1948 September, 1947 April, 1947 March,1950 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Steady - state stability limit of a power system means that the system is capable of maintaining a constant power flow throughout synchronism between machines and on external tie lines All of these the frequency at 50 Hz exactly a constant power flow throughout synchronism between machines and on external tie lines All of these the frequency at 50 Hz exactly ANSWER DOWNLOAD EXAMIANS APP