• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
The Non-co-operation movement was launched by Mahatma Gandhi in

1920
1926
1905
1921

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
An AC transmission line requires a VAR input:

to reduce losses
to improve stability
to improve the regulation
to increase power transmission

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
In an over current protection, the setting of earth fault relay is _____ the phase fault relay.

not related in
less than
equal to
more than

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
In the protection scheme relay functions as _____ device

breaking
switching
none of these
sensing

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The planning Commission was set up in

January, 1948
September, 1947
April, 1947
March,1950

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
Steady - state stability limit of a power system means that the system is capable of maintaining

a constant power flow throughout
synchronism between machines and on external tie lines
All of these
the frequency at 50 Hz exactly

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑