Environmental Engineering The maximum efficiency of BOD removal is achieved in Trickling filters Oxidation ditch Oxidation pond Aerated lagoons Trickling filters Oxidation ditch Oxidation pond Aerated lagoons ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The process in which the chlorination is done beyond the break point is known as Pre-chlorination Break point chlorination Post chlorination Super chlorination Pre-chlorination Break point chlorination Post chlorination Super chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The per capital consumption of a locality is affected by (i) Climatic conditions (ii) Quality of water (iii) Distribution pressure Both (i) and (ii) Both (i) and (iii) Only (i) All (i), (ii) and (iii) Both (i) and (ii) Both (i) and (iii) Only (i) All (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The water carriage system of collection of waste product Requires treatment before disposal All of these Is cheaper in initial cost than dry conservancy system Creates hygienic problem Requires treatment before disposal All of these Is cheaper in initial cost than dry conservancy system Creates hygienic problem ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Which of the following sewers is preferred for combined system of sewage? Egg shaped sewer None of these Rectangular sewer Circular sewer Egg shaped sewer None of these Rectangular sewer Circular sewer ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The rate of filtration in slow sand filters in million litres per day per hectare is about 50 to 60 100 to 150 500 to 600 1400 to 1500 50 to 60 100 to 150 500 to 600 1400 to 1500 ANSWER DOWNLOAD EXAMIANS APP