Environmental Engineering The main disadvantage of cement concrete sewers is Less life Less strength Difficulty in transportation due to heavy weight Difficulty in construction Less life Less strength Difficulty in transportation due to heavy weight Difficulty in construction ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Chlorine demand of water is equal to Sum of applied and residual chlorine Applied chlorine Difference of applied and residual chlorine Residual chlorine Sum of applied and residual chlorine Applied chlorine Difference of applied and residual chlorine Residual chlorine ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The ratio of 5 day BOD to ultimate BOD is about 43833 1 43894 43864 43833 1 43894 43864 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The length of rectangular sedimentation tank should not be more than (Where ‘B’ is the width of the tank) B 4B 2B 8B B 4B 2B 8B ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The method of analysis of distribution system in which the domestic supply is neglected and fire demand is considered is Circle method Electrical analysis method Equivalent pipe method Hardy cross method Circle method Electrical analysis method Equivalent pipe method Hardy cross method ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Residual chlorine in water is determined by None of these Starch iodide method Both (A) and (B) Orthotolidine method None of these Starch iodide method Both (A) and (B) Orthotolidine method ANSWER DOWNLOAD EXAMIANS APP