Power Systems The line current IR flowing into balanced delta connected load is - j5 - 3 A. If the phase sequence is RYB the phase current IYB is 5. 10. 55.1. 20. 5. 10. 55.1. 20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching air blast. oil. vacuum. SF6. air blast. oil. vacuum. SF6. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs shunt capacitor at receiving end shunt reactor at receiving end All of these shunt resistance at receiving end shunt capacitor at receiving end shunt reactor at receiving end All of these shunt resistance at receiving end ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has surge impedance of 400 Ω, operating at Vs = Vr = 400 kV line is compensated with a shunt capacitance of 30%. The line is connected to a generator delivering 200 MW. Find the load angle with out and with compensation respectively? 45° and 26° 30° and 26° 30° and 45° 26° and 30° 45° and 26° 30° and 26° 30° and 45° 26° and 30° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Location of a surge tank, in an hydro electric power station is near dam. turbine. tail race. reservoir. dam. turbine. tail race. reservoir. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of gauss siedel method is/are All of these number of iterations are less calculation time for each iteration is less applicable for large power system network All of these number of iterations are less calculation time for each iteration is less applicable for large power system network ANSWER DOWNLOAD EXAMIANS APP