Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called A heap None of these Windrow Plateau A heap None of these Windrow Plateau ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In normal conditions, the period for sludge digestion, is 10 days 20 days 30 days 60 days 10 days 20 days 30 days 60 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a trickling filter Both A and B Biological action is used Neither A nor B Filtration process is used Both A and B Biological action is used Neither A nor B Filtration process is used ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is 2 hours 3 hours 5 hours 4 hours 2 hours 3 hours 5 hours 4 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 25°C 0°C 15°C 20°C 25°C 0°C 15°C 20°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dilution method of disposing of sewage, is not preferred to When diluting water is used for water supply near the point of sewage disposed When diluting water has high dissolved oxygen content When the diluting water is having flow currents When sewage is fresh When diluting water is used for water supply near the point of sewage disposed When diluting water has high dissolved oxygen content When the diluting water is having flow currents When sewage is fresh ANSWER DOWNLOAD EXAMIANS APP