Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 12 days 2 days 14 days 7 days 12 days 2 days 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers Proper tests for the presence of poisonous gases must be carried out Warning signals should be erected The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes The men entering the manhole should be advised to smoke in the sewer Proper tests for the presence of poisonous gases must be carried out Warning signals should be erected The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes The men entering the manhole should be advised to smoke in the sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The disintegrating pump in which solid matter is broken up before passing out, is None of these Pneumatic ejector Reciprocating pump Centrifugal pump None of these Pneumatic ejector Reciprocating pump Centrifugal pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Hardness Bacterias Suspended solids Sediments Hardness Bacterias Suspended solids Sediments ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In primary sedimentation, the 0.2 mm inorganic solids get separated if specific gravity is 2.65 2.55 2.25 2.5 2.65 2.55 2.25 2.5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by All listed here Kinchling Lloyd Davis Frubling All listed here Kinchling Lloyd Davis Frubling ANSWER DOWNLOAD EXAMIANS APP