The grit chambers of sewage treatment plants, are generally cleaned after

7 days
2 days
14 days
12 days

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In sewers the velocity of flow should not be

Less than 10 m/sec
Less than the self-cleansing velocity
More than the self-cleansing velocity
More than 20 m/sec

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
For a continuous flow type of sedimentation tanks

Maximum horizontal flow velocity is limited to 0.3 m/minute
Length of the tank is normally kept 4 to 5 times the width
Width of the tank is normally kept about 6 m
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Maximum permissible velocity 1.5 m/sec, is adopted in drains

Lined with stones
With beds of rocks and gravels
Both A. and B.
Neither A. nor B.

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
For providing an Indian type W.C., the R.C.C. slabs in the toilet portion

Should be sunk by 50 cm
Need not be sunk
Should be sunk by 20 cm
Should be kept 20 cm above the adjacent portion

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The ratio of maximum sewage flow to average sewage flow for mains up to 1 m in diameter, is

4
1.5
3
2

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑