Mechanical Operations
The energy required per unit mass to grind limestone particles of very large size to 100 μm is 12.7 kWh/ton. An estimate (using Bond's law) of the energy to grind the particles from a very large size to 50 μrn is

9.0 kWh/ton
6.35 kWh/ton
18 kWh/ton
25.4 kWh/ton

ANSWER DOWNLOAD EXAMIANS APP

Mechanical Operations
Arrange the following size reduction equipment in the decreasing order of the average particle size produced by each of them.

Fluid energy mill, Jaw crusher, Ball mill
Fluid energy mill, Ball mill, Jaw crusher
Jaw crusher, Ball mill, Fluid energy mill
Ball mill, Jaw crusher, Fluid energy mill

ANSWER DOWNLOAD EXAMIANS APP