GETCO Exam Paper (11-06-2017) The efficiency of solar cell is about 0.6 0.4 0.15 0.25 0.6 0.4 0.15 0.25 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a load duration curve for an integrated power system, the uppermost crest represents the energy contributed by which one of the following? Non-conventional power stations Peaking hydro or gas turbine stations Base power stations Major thermal stations Non-conventional power stations Peaking hydro or gas turbine stations Base power stations Major thermal stations ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Load shedding is done for repairing of machines power factor improvement reducing peak demand on the system efficient operation of equipment repairing of machines power factor improvement reducing peak demand on the system efficient operation of equipment ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Current rating is not necessary in case of load break switches isolators circuit breakers circuit breakers and load break switches load break switches isolators circuit breakers circuit breakers and load break switches ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Powe system stability is least affected by reactance of transmission line reactance of generator input torque losses reactance of transmission line reactance of generator input torque losses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Bundled conductors are employed to improve corona performance of the line mechanically stability of the line appearance of the transmission line current carrying capacity of the line corona performance of the line mechanically stability of the line appearance of the transmission line current carrying capacity of the line ANSWER DOWNLOAD EXAMIANS APP