Industrial Engineering and Production Management The disadvantage of product layout is Skilled labour to operate machines High cost of inspection High initial investment for the specialized facilities Production time is longer, requiring more goods in inventory Skilled labour to operate machines High cost of inspection High initial investment for the specialized facilities Production time is longer, requiring more goods in inventory ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The type of organisation preferred for an automobile industry, is Line and staff organisation Functional organisation Line organisation Line, staff and functional organisation Line and staff organisation Functional organisation Line organisation Line, staff and functional organisation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following layouts is suited for mass production? Plant layout Product layout Fixed position layout Process layout Plant layout Product layout Fixed position layout Process layout ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Motion study involves analysis of Layout of work place All of these Tooling and equipment Actions of operator Layout of work place All of these Tooling and equipment Actions of operator ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A critical activity has Maximum slack Average slack Minimum slack Zero slack Maximum slack Average slack Minimum slack Zero slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is positive The activity is critical and any delay in its performance will delay the completion of whole project It represents a situation where extra resources are available and the completion of project is not delayed Any one of the above It represents that a programme falls behind schedule and additional resources are required to complete the project in time The activity is critical and any delay in its performance will delay the completion of whole project It represents a situation where extra resources are available and the completion of project is not delayed Any one of the above It represents that a programme falls behind schedule and additional resources are required to complete the project in time ANSWER DOWNLOAD EXAMIANS APP