Building Construction The differential settlement in case of foundations on sandy soils should not exceed 40 mm 100 mm 65 mm 25 mm 40 mm 100 mm 65 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Spandril Intrados Rise Extrados Spandril Intrados Rise Extrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of bond in which every course contains both headers and stretchers, is called Russian bond English bond Flemish bond Mixed bond Russian bond English bond Flemish bond Mixed bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Between ceiling and floor level Upto ceiling from the ground level Upto roof above ground level Between ceiling and ground level Between ceiling and floor level Upto ceiling from the ground level Upto roof above ground level Between ceiling and ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum bearing capacity of soil is that of Black cotton soil Hard rocks Dry coarse sandy soil Loose fine sandy soil Black cotton soil Hard rocks Dry coarse sandy soil Loose fine sandy soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Skew-back of the arch Highest point on the extrados of the arch None of these Highest point on the intrados of the arch Skew-back of the arch Highest point on the extrados of the arch None of these Highest point on the intrados of the arch ANSWER DOWNLOAD EXAMIANS APP