Environmental Engineering The detention period and overflow rate respectively for plain sedimentation as compared to sedimentation with coagulation are generally More and less Less and less Less and more More and more More and less Less and less Less and more More and more ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Sewage treatment units are normally designed for 15 - 28 years 5 - 10 years 15 - 20 years 28 - 30 years 15 - 28 years 5 - 10 years 15 - 20 years 28 - 30 years ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering For a country like India, where rainfall is mainly confined to one season, the suitable sewerage system will be Separate system Partially combined system Combined system Partially separate system Separate system Partially combined system Combined system Partially separate system ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The disinfection efficiency of chlorine increases by (i) Decreasing the time of contact (ii) Decreasing the temperature of water (iii) Increasing the temperature of water Both (i) and (ii) Both (i) and (iii) Only (i) Only (iii) Both (i) and (ii) Both (i) and (iii) Only (i) Only (iii) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Period of cleaning of slow sand filters is about 24 - 48 hours 1 - 2 year 2 - 3 months 10 - 12 days 24 - 48 hours 1 - 2 year 2 - 3 months 10 - 12 days ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period for oxidation ponds is usually kept as 3 months 10 to 15 days 48 hours 24 hours 3 months 10 to 15 days 48 hours 24 hours ANSWER DOWNLOAD EXAMIANS APP