Building Construction The construction joints in buildings are provided after 20 m 40 m 15 m 10 m 20 m 40 m 15 m 10 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wooden block fixed on back side of a door frame on its post, is known as None of these Horn Stop Cleat None of these Horn Stop Cleat ANSWER DOWNLOAD EXAMIANS APP
Building Construction The sound which continues even after its source is cut off, is called Reverberation Echo Intensity of sound Interference Reverberation Echo Intensity of sound Interference ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: All listed here Distance of G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 All listed here Distance of G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Extremely durable Easy to handle All of these Lighter in weight Extremely durable Easy to handle All of these Lighter in weight ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for Sound insulation All of these Heat insulation Prevention of dampness Sound insulation All of these Heat insulation Prevention of dampness ANSWER DOWNLOAD EXAMIANS APP