Building Construction The construction joints in buildings are provided after 10 m 20 m 40 m 15 m 10 m 20 m 40 m 15 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The entrained concrete is used in lining walls and roofs for making Both (A) and (B) Sound insulated Neither (A) nor (B) Heat insulated Both (A) and (B) Sound insulated Neither (A) nor (B) Heat insulated ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Simplex pile Vibro pile Pressure pile Franki pile Simplex pile Vibro pile Pressure pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Hip Valley Ridge None of these Hip Valley Ridge None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.75 du 1.5 du 1.25 du 1.35 du 1.75 du 1.5 du 1.25 du 1.35 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: All listed here Distance of C.G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 All listed here Distance of C.G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m Area of footing slab = 11.00 m2 ANSWER DOWNLOAD EXAMIANS APP