Power Plant Engineering The breeding gain in case of thermal breeder reactor as compared to fast breeder reactor is Lower Same Higher Unity Lower Same Higher Unity ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a Bucket conveyor Overhead crane Belt conveyor Fork lift truck Bucket conveyor Overhead crane Belt conveyor Fork lift truck ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering The coolant used in boiling water reactor is CO2 Pressurised water Liquid metal Mixture of water and steam CO2 Pressurised water Liquid metal Mixture of water and steam ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering The size of the reactor is said to be critical when It becomes uncontrollable It explodes Chain reaction can be initiated It produces no power It becomes uncontrollable It explodes Chain reaction can be initiated It produces no power ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering Where reactor operation is designed with fast neutrons such as in reactors using highly enriched fuel, the moderator used is No moderator is needed Graphite Heavy water Carbon dioxide No moderator is needed Graphite Heavy water Carbon dioxide ANSWER DOWNLOAD EXAMIANS APP
Power Plant Engineering Reflector in nuclear plants is used to Return the neutrons back into the core Shield the radioactivity completely Conserve energy Check pollution Return the neutrons back into the core Shield the radioactivity completely Conserve energy Check pollution ANSWER DOWNLOAD EXAMIANS APP