Industrial Engineering and Production Management The average time recorded by work study man for an operation is called Representative time Normal time Standard time None of these Representative time Normal time Standard time None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following is independent of sales forecast? Inventory control Production planning Productivity Production control Inventory control Production planning Productivity Production control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bar charts are suitable for All of these Large projects Major works Minor works All of these Large projects Major works Minor works ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be TR + [(S - T)/2] × R TR TR + (S - T) × R TR + [(S - T)/S] × R TR + [(S - T)/2] × R TR TR + (S - T) × R TR + [(S - T)/S] × R ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the incorrect statement from the following. A critical ratio scheduling Determines the status of each activity Establishes the relative priorities among various activities on a common basis All of the these Adjusts automatically changes in activity progress Determines the status of each activity Establishes the relative priorities among various activities on a common basis All of the these Adjusts automatically changes in activity progress ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management One of the basic essentials of an incentive plan is that Minimum wages should be guaranteed A differential piece rate system should exist Provide incentive to group efficiency performance All standards should be based on time studies Minimum wages should be guaranteed A differential piece rate system should exist Provide incentive to group efficiency performance All standards should be based on time studies ANSWER DOWNLOAD EXAMIANS APP