Engineering Drawing The Auto-CAD command used to combine two or more primitive shapes into a single complex 3-dimensional model is ________. Add Union Form Attach Add Union Form Attach ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The architectural drafter usually begins a set of working drawings by creating the ________ plan first. Foundation Elevations Floor plan Building section Foundation Elevations Floor plan Building section ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Acceptable parts must not extend beyond this: Tolerances Hole limits Specification Boundary limits Tolerances Hole limits Specification Boundary limits ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing These weld symbols have no arrow-side or other-side significance: Back or backing weld Surface or groove weld Flash and upset weld Projection or seam weld Back or backing weld Surface or groove weld Flash and upset weld Projection or seam weld ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Some traditional board drafters preferred the drafting machine over the parallel straight edge because it could be used without the need for_________. Circle templates Triangles Technical pens Lettering guides Circle templates Triangles Technical pens Lettering guides ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing The building construction industry relies on sets of ________ drawings to construct homes and commercial buildings. Mechanical Architectural working All of these Isometric Mechanical Architectural working All of these Isometric ANSWER DOWNLOAD EXAMIANS APP