Industrial Engineering and Production Management Templates are used for Advancing a programme in automatic machines Copying complicated profiles Flow of material A planning layout Advancing a programme in automatic machines Copying complicated profiles Flow of material A planning layout ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT requires Triple time estimate Double time estimate Single time estimate None of the listed here Triple time estimate Double time estimate Single time estimate None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it Is a dangling event Consumes time, but no resources Consumes resources but no time Consumes neither time nor resources Is a dangling event Consumes time, but no resources Consumes resources but no time Consumes neither time nor resources ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The determination of standard time in a complex job system is best done through Analysis of standard data system Grouping timing technique Stop watch time study Analysis of micro-motions Analysis of standard data system Grouping timing technique Stop watch time study Analysis of micro-motions ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The grouping of activities into organizational units is called Functional authority Higher level management Corporate plans Departmentation Functional authority Higher level management Corporate plans Departmentation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The objective of time study is to determine the time required to complete a job by New entrant Slow worker Fast worker Average worker New entrant Slow worker Fast worker Average worker ANSWER DOWNLOAD EXAMIANS APP