• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Building Maintenance

Building Maintenance
Shear cracks between the main wall and cross wall can be corrected using:

Grouting
Guining
Toothing
Rebuilding

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
Rehabilitation of structures may be required due to several reasons. Choose the correct reason.

Environmental effects
Compressive effects
Range effects
Tensile effects

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
_________ paint gets deteriorated when exposed to sun.

Asbestos
Bituminous
Aluminium
Oil

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
In restoration of strength by adding external reinforced concrete the damages concrete is first repaired by applying ____________

Tensile load
Compressive load
Overload
Preload

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
In case of bridge greater than 10.7m in height and which cannot be inspected from beneath due to watery situation the instrument suited for inspection work is?

Electrical resistance meter
Strain gauges
Rain guages
Barins snooper vehicle

ANSWER DOWNLOAD EXAMIANS APP

Building Maintenance
Desiccants are chemicals that:

Add humidity
Add moisture
Remove moisture
Remove humidity

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Maintenance

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑