Building Maintenance In case of bridge greater than 10.7m in height and which cannot be inspected from beneath due to watery situation the instrument suited for inspection work is? Barins snooper vehicle Strain gauges Rain guages Electrical resistance meter Barins snooper vehicle Strain gauges Rain guages Electrical resistance meter ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance The component filler in paint does the function of: Reducing cost Smooth Spreading Absorbing oxygen Consistency Reducing cost Smooth Spreading Absorbing oxygen Consistency ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance Which of the below is not a property of ferro cement? No need of formwork Capacity to resist shock Impervious nature Strength per unit mass is low No need of formwork Capacity to resist shock Impervious nature Strength per unit mass is low ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance The slope of a ramp should not be more than: 1 in 20 1 in 35 1 in 15 1 in 10 1 in 20 1 in 35 1 in 15 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance In prestressed concrete structures the primary problem is damaged caused to ____________ Bridge decks Ridges Spans Anchorages Bridge decks Ridges Spans Anchorages ANSWER DOWNLOAD EXAMIANS APP