Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. BEL BHEL SAIL NTPC BEL BHEL SAIL NTPC ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The expected useful life of an hydroelectric power station is around 60 years 30 years 100 years 15 years 60 years 30 years 100 years 15 years ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In a 3 phase system, the line losses are Invesely proportional tocos Ф Directly proportional to cos Ф Inversely proportional to cos²Ф None of the listed here Invesely proportional tocos Ф Directly proportional to cos Ф Inversely proportional to cos²Ф None of the listed here ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the plant restors to load shedding it can be conclucted that Diversity factor is zero Plant is under repairs Peak demand is more than the installed capacity Daily load factor is unity Diversity factor is zero Plant is under repairs Peak demand is more than the installed capacity Daily load factor is unity ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which of the following, in a thermal power plant, is not a fixed cost? Insurance charges Interest on capital Fuel cost Depreciation Insurance charges Interest on capital Fuel cost Depreciation ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The best location of p. f. Correction equipment to be installed on the transmission line is at the None of the listed here Sending end Middle end Receiving end None of the listed here Sending end Middle end Receiving end ANSWER DOWNLOAD EXAMIANS APP