Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. BHEL SAIL BEL NTPC BHEL SAIL BEL NTPC ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which of the following is an advantage of static capacitor for power factor improvement? Ease in installation Low losses All of the listed here Little maintenance cost Ease in installation Low losses All of the listed here Little maintenance cost ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ______ is the reserved generating capacity available for service under emergency conditions which is not kept in operation but but in working order. Firm power Spinning reserve Cold reserve Hot reserve Firm power Spinning reserve Cold reserve Hot reserve ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation A low utilization factor for a plant indicates that plant is used for base load only plant is used for peak load as well as base load plant is used for stand by purpose only plant is under maintenance plant is used for base load only plant is used for peak load as well as base load plant is used for stand by purpose only plant is under maintenance ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The best location of p. f. Correction equipment to be installed on the transmission line is at the Sending end None of the listed here Middle end Receiving end Sending end None of the listed here Middle end Receiving end ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Load factor of a power station is defined as (average load x maximum demand)172 maximum demand/average load average load x maximum demand average load/maximum demand (average load x maximum demand)172 maximum demand/average load average load x maximum demand average load/maximum demand ANSWER DOWNLOAD EXAMIANS APP