Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. BEL NTPC SAIL BHEL BEL NTPC SAIL BHEL ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The area under a load curve gives energy consumed maximum demand None of these average demand energy consumed maximum demand None of these average demand ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In a 3 phase system, the line losses are None of the listed here Invesely proportional tocos Ф Directly proportional to cos Ф Inversely proportional to cos²Ф None of the listed here Invesely proportional tocos Ф Directly proportional to cos Ф Inversely proportional to cos²Ф ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Static capacitors are rated in terms of kW None of the listed here kWh kVAR kW None of the listed here kWh kVAR ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The power transformer is usually rated in kWh kVAR kW kVA kWh kVAR kW kVA ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation For any type of consumer the ideal tariif is Three part tariff Any of the listed here Block rate tariff Two part tariff Three part tariff Any of the listed here Block rate tariff Two part tariff ANSWER DOWNLOAD EXAMIANS APP