• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Economics of Power Generation

Economics of Power Generation
______ public sector undertaking is associated with erection and sometimes running of thermal power plants.

BEL
BHEL
SAIL
NTPC

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The expected useful life of an hydroelectric power station is around

60 years
30 years
100 years
15 years

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
In a 3 phase system, the line losses are

Invesely proportional tocos Ф
Directly proportional to cos Ф
Inversely proportional to cos²Ф
None of the listed here

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
When the plant restors to load shedding it can be conclucted that

Diversity factor is zero
Plant is under repairs
Peak demand is more than the installed capacity
Daily load factor is unity

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
Which of the following, in a thermal power plant, is not a fixed cost?

Insurance charges
Interest on capital
Fuel cost
Depreciation

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The best location of p. f. Correction equipment to be installed on the transmission line is at the

None of the listed here
Sending end
Middle end
Receiving end

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Economics of Power Generation

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑