Economics of Power Generation ______ public sector undertaking is associated with erection and sometimes running of thermal power plants. BHEL BEL NTPC SAIL BHEL BEL NTPC SAIL ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The lagging reactive power drawn by a load is zero. The power factor of the load is None of the listed here 1 0.75 0.5 None of the listed here 1 0.75 0.5 ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which of the following is not necessarily an advantage of interconnecting various power stations? Increased reliability Improved frequency of power supplied Reduction in total installed capacity Economy in operation of plants Increased reliability Improved frequency of power supplied Reduction in total installed capacity Economy in operation of plants ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation With reference to a power station which of the following is not a fixed cost? Fuel cost Depreciation Insurance charges Interest on capital Fuel cost Depreciation Insurance charges Interest on capital ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the plant restors to load shedding it can be conclucted that Peak demand is more than the installed capacity Plant is under repairs Diversity factor is zero Daily load factor is unity Peak demand is more than the installed capacity Plant is under repairs Diversity factor is zero Daily load factor is unity ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Depreciation charge are high in case of Thermal plant Diesel plant Diesel plant Hydroelectric plant Thermal plant Diesel plant Diesel plant Hydroelectric plant ANSWER DOWNLOAD EXAMIANS APP