PROCESS EQUIPMENT AND PLANT DESIGN

Process Equipment and Plant Design
Steam side heat transfer co-efficient for design consideration under ordinary condition can be assumed to be about __________ kcal/hr.m².°C.

1250
7500
15000
2500

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Le/D for a Tee (used as elbow, entering branch) would be

Less than that for Tee (used as elbow, entering run)
Both B and C
Around 90
More than that for Tee (used as elbow, entering run)

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Bubble cap plate column is

A finite stage contactor
Used only for distillation, not for absorption
A differential stage contactor
A continuous contactor

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
In a distillation column, minimum clearance to be maintained betweeen the overflow weir and the last row of the bubble caps is __________ cms.

15
7.5
20
2.5

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
The thermal stress in a metallic bar does not depend upon the

Both A & B
Neither A nor B
Changes in temperature
Cross-sectional area

ANSWER DOWNLOAD EXAMIANS APP
  • «
  • 1
  • ...
  • 21
  • 22
  • 23
  • 24
  • 25
  • ...
  • 74
  • »

GO TO PAGE

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑