Industrial Engineering and Production Management Percent idle time for men or machines is found by Work sampling Time study Work study Method study Work sampling Time study Work study Method study ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The salient feature of functional organisation is All of these Separation of planning and design part Strict adherence to specification Each individual maintains functional efficiency All of these Separation of planning and design part Strict adherence to specification Each individual maintains functional efficiency ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Emergency rush order can be pushed more effectively in Automatic production Continuous production Job production Intermittent production Automatic production Continuous production Job production Intermittent production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management An activity of the project is graphically represented by ________ on the network diagram. A circle None of these An arrow A straight line A circle None of these An arrow A straight line ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Micro motion study is Analysis of a man-work method by using a motion picture camera with a timing device in the field of view Motion study of a sequence of operations conducted systematically Motion study observed on enhanced time intervals Study of man and machine conducted simultaneously Analysis of a man-work method by using a motion picture camera with a timing device in the field of view Motion study of a sequence of operations conducted systematically Motion study observed on enhanced time intervals Study of man and machine conducted simultaneously ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken Activities are fixed and can't be changed A project can be subdivided into a set of predictable, independent activities A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken Activities are fixed and can't be changed A project can be subdivided into a set of predictable, independent activities ANSWER DOWNLOAD EXAMIANS APP