Power Systems Operator "a" rotates a vector nether 1 nor 2 anti clock wise direction either 1 or 2 clock wise direction nether 1 nor 2 anti clock wise direction either 1 or 2 clock wise direction ANSWER DOWNLOAD EXAMIANS APP
Power Systems What should be the minimum depth (in metre)of cable trench to dug for laying of 1.1 kV? 1.05. 0.75. 1.20. 0.90. 1.05. 0.75. 1.20. 0.90. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The inductance of single phase two wire line is given by 0.4×10-7× ln(d/r') H/m 4×10-7× ln(d/r') H/m 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(r'/d) H/m 0.4×10-7× ln(d/r') H/m 4×10-7× ln(d/r') H/m 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(r'/d) H/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a three-phase system, when the loads are perfectly balanced, the neutral current is one - third of maximum. two - thirds of maximum. zero. one - third of minimum. one - third of maximum. two - thirds of maximum. zero. one - third of minimum. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The modern trend in electric power generation to have large size thermal plants near load centre. to have large size thermal plant located near coal fields. to have large number of small size thermal plants located at different places. none of above. to have large size thermal plants near load centre. to have large size thermal plant located near coal fields. to have large number of small size thermal plants located at different places. none of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 57.5 MW. 52 MW. 53 MW. 51.61 MW. 57.5 MW. 52 MW. 53 MW. 51.61 MW. ANSWER DOWNLOAD EXAMIANS APP