Power Systems Location of a surge tank, in an hydro electric power station is near reservoir. turbine. dam. tail race. reservoir. turbine. dam. tail race. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 56 %. 28 %. 14 %. None of above 56 %. 28 %. 14 %. None of above ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault is very nearer to the generator, the fault current is any of the above zero less larger any of the above zero less larger ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following decides the insulation level of 400 kV, EHV line? lighting voltage radio interference skin effect switching over voltage lighting voltage radio interference skin effect switching over voltage ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is a reaction turbines None of these. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. Francis turbine and Kaplan turbine. None of these. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. Francis turbine and Kaplan turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? 31.35 to 34.65 kV 25 to 35 kV 33 to 50 kV any voltage above 33 kV 31.35 to 34.65 kV 25 to 35 kV 33 to 50 kV any voltage above 33 kV ANSWER DOWNLOAD EXAMIANS APP