GETCO Exam Paper (11-06-2017) Load shedding is done for reducing peak demand on the system power factor improvement efficient operation of equipment repairing of machines reducing peak demand on the system power factor improvement efficient operation of equipment repairing of machines ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The injection of VARs is required to increase the voltage at the receiving end get a good voltage profile compensate for line losses all increase the voltage at the receiving end get a good voltage profile compensate for line losses all ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Conductivity of aluminium is _____ time of that of copper 0.6 2.5 1.63 0.4 0.6 2.5 1.63 0.4 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The efficiency of solar cell is about 0.25 0.4 0.15 0.6 0.25 0.4 0.15 0.6 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The volume of copper required for an ac transmission line is inversely proportional to voltage voltage and power factor current power factor voltage voltage and power factor current power factor ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In thermal power plants, the pressure in the working fluid cycle is developed by superheater condenser feed water pump turbine superheater condenser feed water pump turbine ANSWER DOWNLOAD EXAMIANS APP