Length of the cable is doubled, its capacitance C will be

 doubled.
 one-fourth.
 unchanged.
 one-half.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station?

 30 MW
 72 MW
 720 MW
 50 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A power generating station has a plant capacity of 200 MW and maximum power demand is 150 MW. If average power generation is 110 MW, then find the load factor and capacity factor respectively?

 0.55 and 0.733
 0.733 and 0.55
 0.65 and 0.55
 0.733 and 0.65

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be

  0.83.
 0.25.
 1.3.
 0.44.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Ideal plant load cfactor is

 less than 1
 greater than 1
 1
 0

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A generating station which has a high investment cost and low operating cost is usually operated as a

 None of above.
 Base load station.
 Minimum load station.
 Peak load station.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑