Power Systems In thermal power stations, economiser will reduce the heat both 2 and 3 reduce the thermal efficiency increase the thermal efficiency reduce the heat both 2 and 3 reduce the thermal efficiency increase the thermal efficiency ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 20 MW 80 MW 15 MW 10 MW 20 MW 80 MW 15 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A gas turbine power plant is best suited for Peak load. None of these. Emergency. Base load. Peak load. None of these. Emergency. Base load. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a neutral point of 3 - Φ system is directly connected to earth then it has what type of grounding? Solid. Resistance. Peterson coil. Reactance. Solid. Resistance. Peterson coil. Reactance. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear reactors usually employ both of A and B. none of above. fission. fusion. both of A and B. none of above. fission. fusion. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The most commonly used material for insulators of overhead lines is porcelain glass PVC mica porcelain glass PVC mica ANSWER DOWNLOAD EXAMIANS APP