GETCO Exam Paper (22-07-2015) In sub stations for making and breaking of load current load interrupter switches are used circuit breakers are used relays are used isolators are used load interrupter switches are used circuit breakers are used relays are used isolators are used ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In case of a balanced three phase sinusoidal AC supply, because of the phase difference all are correct rotating magnetic field is produced neutral wire is not required, if load is balanced neutral current is high if load is not balanced all are correct rotating magnetic field is produced neutral wire is not required, if load is balanced neutral current is high if load is not balanced ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following breaking method save energy? resistor breaking plugging regenerative breaking dynamic breaking resistor breaking plugging regenerative breaking dynamic breaking ANSWER EXPLANATION DOWNLOAD EXAMIANS APP three types of electric breaking:Regenerative breaking( leads to economic and energy consevation)pugging (more efficient method of breaking)rheostatic breaking
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents average load of the system energy generated in the period considered base load of the system Maximum demand of the power station average load of the system energy generated in the period considered base load of the system Maximum demand of the power station ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) I _____ tennis every Sunday morning play playing am playing am play play playing am playing am play ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who is the vice president of India? (As on 22/07/2015) Pranav Mukharjee O.P. Kohli Nazama heptulla Dr. Hamid Ansari Pranav Mukharjee O.P. Kohli Nazama heptulla Dr. Hamid Ansari ANSWER DOWNLOAD EXAMIANS APP