Industrial Engineering and Production Management In jobbing production Highly skilled workers are needed Operations are labour-intensive All of these Unit costs are high Highly skilled workers are needed Operations are labour-intensive All of these Unit costs are high ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode Late start Early finish Late finish Early start Late start Early finish Late finish Early start ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Basic motion time study gives times for basic motions in ten thousandths of Day Hour Minute Second Day Hour Minute Second ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Basic tool in work study is Stop watch Planning chart Process chart Stop watch Planning chart Process chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The factors which are to be considered while developing a good wage incentive plan will include Guaranteed basic pay Ease of administration Adequate incentive All of the listed here Guaranteed basic pay Ease of administration Adequate incentive All of the listed here ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The chart which gives an estimate about the amount of materials handling between various work stations is known as Flow chart Travel chart Process chart Operation chart Flow chart Travel chart Process chart Operation chart ANSWER DOWNLOAD EXAMIANS APP