In Francis turbine runner, the number blades is usually of the order of

 3 - 6.
  16 - 24.
 6 - 8.
 12 - 14.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW?

 P1 = 100 MW, P2 = 100 MW
 P1 = 120 MW, P2 = 80 MW
 P1 = 80 MW, P2 = 120 MW
 P1 = 60 MW, P2 = 140 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Find the number of strands of ACSR conductor for 3 layer transmission line?

 29
 7
 19
 1

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Direct conversion of heat energy into electrical energy is possible through

 Both A and C.
 Thermal converters.
 MHD generator.
 Fuel or solar cell.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The angular moment of 10 MVA generator is 0.2. Find the new value of angular moment for 20 MVA base?

 0.25 pu
 0.1 pu
 0.4 pu
 0.2 pu

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 100 Km long transmission line is loaded at 110 kV. If the loss of line is 5 MW and the load is 150 VA the resistance of the line is

 4.65 Ω / phase.
  8.06 Ω / phase.
 2.26 Ω / phase.
 6.06 Ω / phase.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑