Airport Engineering In an airport, if 4 groups of 5 gates each located well separated are considered for traffic and the future to present traffic ratio is 3, then the total requirement of future gates will be 36 44 68 32 36 44 68 32 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Airport elevation is the reduced level above M.S.L. of Highest point of the landing area Lowest point of the landing area Control tower None of these Highest point of the landing area Lowest point of the landing area Control tower None of these ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Assertion A : The ratio of arriving and departing aircrafts influences the airport capacity:Reason R : Landing operation is generally given priority over the taking off operation.Select your answer based on the coding system given below: Both A and R is true and R is the correct explanation of A A is false but R is true A is true but R is false Both A and R is true and R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true A is true but R is false Both A and R is true and R is not the correct explanation of A ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The bearing of the longest line of a wind rose is S 45° E, the bearing of the runway will be numbered 135° Both (C) and (D) 13 31 135° Both (C) and (D) 13 31 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering If the monthly mean of average daily temperature for the hottest month of the year is 25°C and the monthly mean of the maximum daily temperature of the same month of the year is 46°C, the airport reference temperature is 32°C 35.5°C 48°C 25°C 32°C 35.5°C 48°C 25°C ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Runway threshold is indicated by a series of parallel lines starting from a distance of 10 m from runway end 3 m from runway end 6 m from runway end 15 m from runway end 10 m from runway end 3 m from runway end 6 m from runway end 15 m from runway end ANSWER DOWNLOAD EXAMIANS APP