Airport Engineering In an airport, if 4 groups of 5 gates each located well separated are considered for traffic and the future to present traffic ratio is 3, then the total requirement of future gates will be 36 32 44 68 36 32 44 68 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering An airport has 4 gates. If the weighted average gate occupancy time is 30 minutes and gate utilization factor is 0.5, then the capacity of the gate will be 16 aircrafts per hour 2 aircrafts per hour 1 aircraft per hour 4 aircrafts per hour 16 aircrafts per hour 2 aircrafts per hour 1 aircraft per hour 4 aircrafts per hour ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The runway length after correcting for elevation and temperature is 2845 m. If the effective gradient on runway is 0.5 percent then the revised runway length will be 3030 m 2845 m 3130 m 2910 m 3030 m 2845 m 3130 m 2910 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Which of the following is used for servicing and repairs of the aircraft? Hanger Holding apron Terminal building Apron Hanger Holding apron Terminal building Apron ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering According to the International Civil Aviation Organization (I.C.A.O.) the strength of runway pavements, have been coded by Seven English alphabets Last Seven English alphabets First seven numbers First Seven English alphabets Seven English alphabets Last Seven English alphabets First seven numbers First Seven English alphabets ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering For night landing, the thresholds are lighted Green Red Yellow White Green Red Yellow White ANSWER DOWNLOAD EXAMIANS APP