Economics of Power Generation If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is C/3 3C √3C C/√3 C/3 3C √3C C/√3 ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which plant can never have 100 percent load factor? Peak load plant Nuclear power plant Hydroelectric plant Base load plant Peak load plant Nuclear power plant Hydroelectric plant Base load plant ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation During load shedding Some loads are switched off System voltage is reduced System power factor is changed System frequency is reduced Some loads are switched off System voltage is reduced System power factor is changed System frequency is reduced ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ______ is the reserved generating capacity available for service under emergency conditions which is not kept in operation but but in working order. Cold reserve Hot reserve Firm power Spinning reserve Cold reserve Hot reserve Firm power Spinning reserve ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation The least share of power in provided in india, by which of the following power plants? Diesel power plant Nuclear power plant Hydroelectric plant Thermal power plant Diesel power plant Nuclear power plant Hydroelectric plant Thermal power plant ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which of the following is the disadvantage due to low power factor ? Increased transmission losses Poor voltage regulation High cost of equipment for a given load All of these Increased transmission losses Poor voltage regulation High cost of equipment for a given load All of these ANSWER DOWNLOAD EXAMIANS APP