GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on tolerance remains fixed depends on no of buses depends on voltage control buses depends on tolerance remains fixed depends on no of buses depends on voltage control buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as a voltag dependent impedance at the bus a constant current drawn from the bus a constant impedance connected at the bus none of these a voltag dependent impedance at the bus a constant current drawn from the bus a constant impedance connected at the bus none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Minimum up time Minimum down time Spinning reserve all are correct Minimum up time Minimum down time Spinning reserve all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means Equal potential across each disc Zero potential across each disc None uniform potential distribution across each disc One of the insulator discs shorted Equal potential across each disc Zero potential across each disc None uniform potential distribution across each disc One of the insulator discs shorted ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Reactive power limit Short circuit limit Transient stability limit Steady state limit Reactive power limit Short circuit limit Transient stability limit Steady state limit ANSWER DOWNLOAD EXAMIANS APP