GETCO Exam Paper (11-06-2017) For the protection of power system against travelling waves, we use earthing screens surge diverters None of these overhead ground wires earthing screens surge diverters None of these overhead ground wires ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The volume of copper required for an ac transmission line is inversely proportional to current voltage voltage and power factor power factor current voltage voltage and power factor power factor ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) For an overhead line, the surge impedance is taken as 100-200 Ω 500-1000 Ω 70-80 Ω 20-40 Ω 100-200 Ω 500-1000 Ω 70-80 Ω 20-40 Ω ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Diversity factor is always more than twenty less than unity more than unity equal to unity more than twenty less than unity more than unity equal to unity ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) SCADA is real time data acquisition and processing all data monitoring and control data storing real time data acquisition and processing all data monitoring and control data storing ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) If the length of a cable is doubled, its capacitance becomes double becomes one-fourth becomes one half remains unchanged becomes double becomes one-fourth becomes one half remains unchanged ANSWER DOWNLOAD EXAMIANS APP