DGVCL Exam Paper (12-06-2016) For cost & safety, the outdoor substations are installed for voltages above: 110 kV 11 kV 33 kV 60 kV 110 kV 11 kV 33 kV 60 kV ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) For a 66 kV line having span of 200 meters between towers the approximate sag will be 2 m. If the span is double the sag will be: 2 m 1 m 4 m 8 m 2 m 1 m 4 m 8 m ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The acting contacts for a circuit breakers are made of : Copper Tungsten alloy Stainless Steel Hard-pressed carbon Porcelain Copper Tungsten alloy Stainless Steel Hard-pressed carbon Porcelain ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) In fuel cell the _____ energy is converted into electrical energy. Sound Heat Chemical Mechanical Sound Heat Chemical Mechanical ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) The Minimum Oil Circuit Breaker (MOCB) is named because of : Reduced requirement of air All of these Reduced requirement of oil None of these Reduced requirement of air All of these Reduced requirement of oil None of these ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (12-06-2016) True value has been 50 whereas measured value is 40 then the percentage error in the reading will be _____ 0.3 0.2 0.5 0.4 0.3 0.2 0.5 0.4 ANSWER EXPLANATION DOWNLOAD EXAMIANS APP %error = 100 * (actual - measured )/ actual