Building Construction
For a wall carrying heavy load on low bearing capacity soil,

Both (A) and (C) of the above
Lean concrete bed is provided
Thick concrete bed is provided
Reinforced concrete bed is provided

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Which one of the following activities is not correct as applicable to brick corbels

Stretcher bond is generally used for the construction of brick corbel
The discontinuous corbels are used to carry heavy concentrated loads
The maximum projection of the corbel should not be more than the thickness of the wall
The maximum projection of each corbel course should be limited to a quarter brick at a time

ANSWER DOWNLOAD EXAMIANS APP