Building Construction For a wall carrying heavy load on low bearing capacity soil, Thick concrete bed is provided Both (A) and (C) of the above Lean concrete bed is provided Reinforced concrete bed is provided Thick concrete bed is provided Both (A) and (C) of the above Lean concrete bed is provided Reinforced concrete bed is provided ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 20 m 15 m 10 m 5 m 20 m 15 m 10 m 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Intrados Rise Spandril Extrados Intrados Rise Spandril Extrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 450 420 500 350 450 420 500 350 ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to English bond, double Flemish bond is Costly None of these Stronger More compact Costly None of these Stronger More compact ANSWER DOWNLOAD EXAMIANS APP